  • Lokalizacja: 53.1034,23.1940
  • Galeria:

  • Stan realizacji: zrealizowane

Investor: Rosti Poland Ltd.

Warehouse building with production and office-administrative part. In addition, the excavated traffic system and parking lots, the necessary technical infrastructure at 18 Myśliwska Street in Bialystok, and with the construction of an exit from Kuronia Street. 

 

  • Lokalizacja: 53.1536,24.8260
  • Galeria:

  • Stan realizacji: zrealizowane

Investor: ZILANT Sp. z o.o.

Implementation time: 12 months

Insurance: www.kuke.com.pl 

  • Lokalizacja: 54.4440,30.2916
  • Galeria:

  • Stan realizacji: zrealizowane

Investor: Bremino Group

Completion date: 14 months

  • Lokalizacja: 53.1055,23.1871
  • Galeria:

  • Stan realizacji: zrealizowane

Investor: Bravilor Bonamat Ltd.

Implementation time: 9 months

The ultra-modern production and warehouse hall built in the Bialystok Subzone of the Special Economic Zone is a complex consisting of a warehouse building with production and office and administrative parts. The project also included the construction of a traffic system with parking lots, the necessary technical infrastructure at 18 Myśliwska Street in Bialystok and the construction of an exit from Kuronia Street.

It is the largest in Poland and the third largest in Europe. 

  • Lokalizacja: 52.9127,22.4962
  • Galeria:

  • Stan realizacji: zrealizowane

IInvestor: Mlekovita Dairy Cooperative 

  • Lokalizacja: 52.9609,36.0896
  • Galeria:

  • Stan realizacji: zrealizowane

Investor: CJSC Bioton Vostok, 70 Naberezhna Dubrovinskaya Orzel

 

  • Lokalizacja: 52.7734,23.1778
  • Galeria:

  • Stan realizacji: zrealizowane

Own investment

  • Lokalizacja: 52.2295,19.3541
  • Galeria:

  • Stan realizacji: zrealizowane

Investor: Fresenius Kabi Polska Sp. z o.o. 

 

  • Lokalizacja: 54.0533,22.9187
  • Galeria:

  • Stan realizacji: zrealizowane

Investor: Tanne Sp. z o.o.